§ 146-447. Filling of cut on paved and asphalt surfaced streets.
Latest version.
As soon as practical following the installation of the subsurface structure or structures,
all trenches and pits on all paved and asphalt surfaced streets shall be carefully
refilled in accordance with the standards and specifications established by the director
of the department of public works. The backfill may be inspected by the director of
the department of public works prior to repaving and, if the director determines that
the refill is not satisfactory, he shall have the right to order the permittee to
remove all of the filled material from the excavation and to have same refilled at
the expense of the permittee. If such person fails to remove the unsatisfactory fill,
the entire deposit shall be forfeited. Whenever caving occurs in the sidewall of any
excavation, the pavement above such caving shall be removed and in no case shall any
void or cavity be restored by side or lateral filling or tamping.
(M.C.S., Ord. No. 26646, § 1, 11-5-15)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');