§ 70-416. Advertised specifications for certain work to call for payment of minimum wages.
Latest version.
The advertised specifications for every contract in excess of $25,000.00, to which
the city is a party, for construction, alteration or repair, including painting and
decorating, of public buildings or public works of the city, which requires or involves
the employment of mechanics or laborers, shall contain a provision listing each job
classification and stating specifically the minimum wages to be paid to the various
classes of workmen, laborers and mechanics to be employed on the job, based on wages
that will be determined by the Secretary of the United States Department of Labor,
to be the prevailing wages for the corresponding classes of laborers and mechanics
employed on projects in the city of a character similar to the contract work to be
performed. Prevailing wages listed in the specifications must be obtained from the
appropriate source within 30 days before the specifications are advertised or publicized,
and the contract must be signed within 90 days thereafter.
(Code 1956, § 2-41)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');